30–420W Modular LED Street Light
The 30–420W Modular LED Street Light combines a die-cast aluminum electrical compartment with extruded aluminum profiles and independent LED light modules. Its seven available length configurations allow lighting specifications to be adapted to different road projects.
Designed for motorways, pedestrian roads, rural routes and mountainous areas, the series provides a serviceable lighting structure with flexible installation and optional smart-lighting interfaces.
Product parameters
| Attribute | Specification |
|---|---|
| Product model | R.3251 |
| Series power range | 30–420W |
| Module count | 1–7 |
| Module power | 30–60W per LED module |
| Overall length options | 595 / 675 / 755 / 835 / 915 / 995 / 1075 mm |
| Housing width / height | 360 mm / 133 mm |
| Series weight range | 6.0–11.9 kg |
| Luminous efficiency | 130–180 lm/W |
| Optical distribution | Type II / Type III |
| Input voltage | 90–305 VAC, 50/60 Hz |
| LED optical module protection | IP67 |
| Luminaire ingress protection | IP66 |
| Impact resistance | IK09 |
| Safety class | Class I / Class II |
| CRI | Ra ≥70 |
| Corrosion protection | WF2 |
| Ambient temperature | −45°C to +50°C |
| Ambient humidity | 10–95% RH |
| Color temperature | 2200K / 2700K / 3000K / 4000K / 5000K |
| Adjustment range | ±90° |
| Pole diameter options | Ø34 / Ø48 / Ø60 / Ø76 mm |
| Housing | Die-cast aluminum electrical compartment with extruded aluminum profiles |
| Access | Tool-free opening electrical cavity |
| Optional equipment | Anti-falling steel cable; surge protection (10/15/20/40kV); NEMA / Zhaga interface; power-off protection; photocontrol and single-luminaire control |
Product Model Comparison
| Configuration | Length 1 | Length 2 | Length 3 | Length 4 | Length 5 | Length 6 | Length 7 |
|---|---|---|---|---|---|---|---|
| Overall length | 595 mm | 675 mm | 755 mm | 835 mm | 915 mm | 995 mm | 1075 mm |
| Housing width | 360 mm | ||||||
| Housing height | 133 mm | ||||||
| Power / module count | Series range: 30–420W / 1–7 modules | ||||||
| Weight | 6.0–11.9 kg (series range) | ||||||

Dimensions for Project Planning
The seven housing lengths offer flexible options for matching luminaire size, installation space and road lighting needs.
Select a suitable housing length and modular configuration for your roadway lighting project.
Match the distribution to the site.

Tool-Free Electrical Compartment
The electrical cavity is designed to open by hand without tools, allowing technicians to inspect internal components more conveniently during scheduled maintenance.

Scalable Modular Light Engine
The luminaire uses multiple independent lighting modules. Each module is rated IP67, with a matching waterproof connector. The series is offered in seven length configurations to support varying roadway lighting requirements.

Horizontal or Vertical Pole Mounting
The pole connection supports horizontal and vertical installation. An adjustable-angle dial and an integrated level indicator help crews check positioning on site.

Safety and Smart-Lighting Options
Optional anti-falling steel cable, 10/15/20/40kV surge protection, power-off protection on opening and NEMA or Zhaga interfaces can be specified according to project requirements.
Match the distribution to the site.
Applications
Explore typical road-lighting environments where modular LED street lights can be specified to meet local installation and photometric requirements.

Motorways & Urban Roads
Supports large-scale roadway lighting projects that require reliable fixtures, consistent coverage and adaptable module configurations.

Pedestrian Roads
Suitable for pedestrian routes and local access roads, with optics and power selected around site-specific illumination needs.

Rural & Mountain Roads
Provides configurable street lighting for rural routes, small roads and mountainous areas where installation conditions may vary.

Bridges & Elevated Roads
Offers flexible mounting choices for infrastructure projects where lighting coverage, fixture accessibility and installation layout matter.
Share your project wattage, road width, mounting height, pole spacing and preferred control interface. We can review suitable configurations and provide product information for your lighting project.